<VV> Trailing arm/Hub carrier bolt pattern
Dave Keillor
dkeillor at tconcepts.com
Wed Apr 12 14:22:35 EDT 2006
The stud mounting pattern is a symmetrical trapezoid. The top two studs
are 3-1/2" apart horizontally. The lower two are 3-3/16" apart
horizontally. The vertical spacing is 2". These measurements were made
with a metal tape measure.
Dave Keillor
-----Original Message-----
From: virtualvairs-bounces at corvair.org
[mailto:virtualvairs-bounces at corvair.org] On Behalf Of Sethracer at aol.com
Sent: Wednesday, April 12, 2006 10:54 AM
To: fastvair at yahoogroups.com; virtualvairs at corvair.org
Subject: <VV> Trailing arm/Hub carrier bolt pattern
Does anybody have easy access to a 65-69 trailing arm or rear hub? I
need to
know the bolt pattern of the four studs that mount the cast bearing
carrier
to the stamped steel trailing arm. Can someone measure one and drop me
back a
note? Thanks in advance. - Seth Emerson
_______________________________________________
This message was sent by the VirtualVairs mailing list, all copyrights
are the property
of the writer, please attribute properly. For help,
mailto:vv-help at corvair.org
This list sponsored by the Corvair Society of America,
http://www.corvair.org/
Post messages to: VirtualVairs at corvair.org
Change your options:
http://www.vv.corvair.org/mailman/options/virtualvairs
_______________________________________________
More information about the VirtualVairs
mailing list